![]() NLDC have no liability in tort, contract, or otherwise to user and/or third party. NLDC disclaims all express, implied, and statutory warranties of any kind to user and/or any third party, including warranties as to accuracy, timeliness, completeness, merchantability, or fitness for any particular purpose. All information is provided without warranty of any kind. However, before relying on the information material, users are advised to ensure its accuracy, currency, completeness and relevance for their purposes, and, in this respect, NLDC shall not be responsible for any errors or omissions. Precautions have been taken by National Load Dispatch Center (NLDC) to upload the data/information and the uploaded data/information is believed to be accurate, reliable and complete. Inertia Assessment in the Indian Power System. ![]() India Renewable Integration Study Report.Solar Eclipse Indian Power System likely impacts and preparedness- A Report.Solar Eclipse Analysis of its Impact on the Indian Power System – A Report.Report on Pan India Lights of Event (9 PM at 9 PM) on 5th April 2020.Report on Flexibility Analysis of Thermal Generation for Renewable Integration in India.Solar Eclipse of 21.06.20 Possible Effects and Preparation – A Report.Solar Eclipse 21 June 2020_Analysis of its impact on the Indian Power System-A Report.Seasonality Analysis of Load Factor-Indian power system perspective.Detailed Procedure for Tertiary Reserve Ancillary Services (TRAS) – April 2023.Detailed Procedure for Secondary Reserve Ancillary Services (SRAS) – Dec 2022.Notification of Transmission Charges for the DICs.Five Minute Metering and Accounting in India.Renewable Energy Certificate (REC) Mechanism.Report: FRAS Pilot Project Experience and Feedback.Detailed Feedback Report on SCED Pilot – Mar 2022.Detailed Feedback Report on SCED Pilot – Sep 2021.Detailed Feedback Report on SCED Pilot – Mar 2021.Detailed_Feedback_Report on SCED Pilot – Jan 2020.National Statement of Compensation due to Part Load Operation on Account of SCED.National SCED benefit sharing statement.Registration of trading licensee and Power Exchange.Statement of Congestion Charge (Format VI).Application of Charge Notice (Format IV).Procedure for Normal Rate of Charges for Deviation.First Time Charging Procedure for Power system Elements.Procedure for Charging Altered (including modified/replaced/upgraded) Elements.MoP order: Optimization of use of power generated/allocation of Central Generating Station.Terms and conditions of appointment of independent directors. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |